CURRENT PROJECTS

Newstan Vent Shaft Abergeldie has been contracted by Centennial Coal\'s ...

Kipparing Sewer Pumpstation 20X Replacement Install new sewer main and construction of Sewer ...

Coombabah and Elanora WWTP Sludge Handling Upgrade Design, Supply three BFP, Polymer system, Civil and ...

Integra Vent Shaft Construction of a vent shaft 5.5m finished diameter ...

Appin Vent Shaft This shaft is a 6.2m drilled, 5m finished steel/ ...

Blackall Range Tunnel The refurbishment of a 2500m long, 3.5m x 2.5m tunnel ...



COMPLETED PROJECTS

Lennox Heads Wastewater Treatment Works Optimisation Upgrade Design, install and commission ...

Blue Water Trail Construction of 1km of raised boardwalk above ...

Chichester Dam Abergeldie were engaged to carry out remedial work to ...

City Road Foot Bridge Construction of a pedestrian footbridge over City Road ...

Warragamba Dam Auxiliary Spillway Excavation of rock for the ...

Shell Refinery Civil works for general upgrading of infrastructure at ...