Abergeldie Project TitleTunnelling
Cotter Tunnel No. 3 Stabilisation Cotter Tunnel No. 3 Stabilisation
Aug 08 - Aug 09
ACTEWAGL DISTRIBUTION

The project involved stabilising the existing tunnel to protect an existing watermain housed within the tunnel.
Value: $1 500 000

2009 WINNER - Category 2, ACT CCF Hitachi Earth Awards

Design and Construction of a Pipejack Tunnel Between Carlton Sts and the New Kogarah Sts Design and Construction of a Pipejack Tunnel Between Carlton Sts and the New Kogarah Sts
Nov 07 - 08
ENERGY AUSTRALIA

Design and construction of a 2400mm diameter by 120m long pipe jack tunnel including fitout with stainless steel cable support brackets. Construction of a deep cable pit, with stainless steel access ladders and platforms, to provide access to the tunnel. The tunnel is located beneath railway lines and roads and has strict settlement and environmental monitoring requirements.
Value: $4 700 000


Construction of Two Pipejack Tunnels at Pymble and Artamon Construction of Two Pipejack Tunnels at Pymble and Artamon
Mar 05 - Apr 08
ENERGY AUSTRALIA

The works comprised the design and construction of two pipe jack tunnels. The Pymble tunnel is a 33 KV cable circuit, a 97m long and 1650mm diameter structure bored through shale. The Artarmon tunnel is a 132 KV Cable circuit, a 111m long and 1650mm diameter structure excavated in sandstone. Both tunnels are constructed under rail corridors.
Value: $300 000

Reserve Road Shared Cycle Underpass Reserve Road Shared Cycle Underpass
Nov 04 - Nov 05
THEISS JOHN HOLLAND

Construction of a shared cycle underpass at Reserve Road, Artarmon. Work includes demolition of existing wingwalls, construction of tie beams, shear keys, temporary retaining structures and the construction and installation of 4.5 x 3.5m reinforced concrete box culverts. Installation includes a jacking system which incorporates a purpose made shield and thrust block.
Value: $1 500 000

 
Abergeldie
Abergeldie

Drill Rig 100 Debut


The world's largest blind bore drill rig has debuted on the Austar Mine Project. This exciting project involves construction of a 4.5m wide and 465m deep ventilation and access shaft for the Austar coal mine.

2009 CCF Award Success


Abergeldie Complex Infrastructure won the 2009 National Category 2 Award for the Erskineville Railway Overbridge. Abergeldie won four categories overall at the NSW & ACT Earth Awards for Construction Excellence.

Brisbane Office Construction


Abergeldie is constructing it's new premises in Brisbane. Production is running at a fast pace and we hope to be operating from the office by mid August. In the meantime, it's business as usual for the Northgate office.

Oxfam Challenge


Abergeldie has two teams entered in the 2010 Oxfam Challenge. Abergeldie Green and Abergeldie Black will be walking 100km in 48 hours.

CEO Winter Sleep Out


Mick braved the cold again for his third winter sleep out with the St Vincent de Paul society....

ASM Fabrications Moves in


ASM Fabrications is located in the Regents Park Estate. Abergeldie has a 50% interest in the company which provides a competitive advantage in steelwork.

Australia's Biggest Morning Tea


Over $25000 was raised to help fund research to find a cure for cancer.

Abergeldie
Abergeldie
Subscribe to Abergeldie’s Newsletter Service
Email
Firstname
Lastname
Abergeldie
Contact Abergeldie
Sydney
PO Box 10, Regents Park
NSW 2143
p: 02 8717 7777
e: mail@abergeldie.com
Brisbane
PO Box 135, Banyo
QLD 4014
p: 07 3621 0000
e: qld@abergeldie.com
Newcastle
PO BOX 326, Thornton
NSW 2322
p: 02 4966 3899
e: mail@abergeldie.com
Canberra
PO BOX 56 Mitchell
BC 2911
p: 02 6241 1755
e: mail@abergeldie.com
Contact ASM Fabrications
5/5 George Young St
Regents Park NSW 2143
p: 02 9644 7300
e: mhanda@asmfabrications.com.au
Abergeldie