Construction of Two Cable and Pedestrian Bridges
|
May 09 - Sep 09
ENERGY AUSTRALIA PTY LTD
Construction of two cable and pedestrian bridges in NSW over waterways. The Concord bridge is 18m and The Galston Bridge is 25m in length.
Value: $750 000
|
|
|
|
|
Stanhope Parkway Bridge
|
Nov 08 - Aug 09
WESTERN EARTHMOVING
Construction of a precast concrete bridge for vehicular traffic, pedestrian access and a cycleway that joins Quakers Hill with Stanhope. Western Earthmoving completed the subdivision and roadwork's. A project highlight was the placement of 22 concrete girders which went exceptionally smoothly.
Value: $ 3 500 000
|
|
|
|
|
South Creek Windsor Bridge
|
Aug 08 - Jul 09
RTA
Construction of a 3 span bridge with supporting pre-tensioned 'I' girders with precast transfloor floor panels as permanent formwork overlayed with an insitu slab. Handrails and balustrades along the bridge, gates, fences. 880m of coloured concrete pathway. Rectification of drainage and earthworks.
Value: $3 000 000
|
|
|
|
|
GWH Upgrade Hazelbrook - Construction of Skywalk Bridge and Suspended Slab
|
Oct 07 - Jul 08
RTA
Supply and construction of a pedestrian footbridge and a suspended slab for footpath relocation associated with the realignment of the Great Western Highway at Hazelbrook in the Blue Mountains west of Sydney. The Skywalk Bridge consists of reinforced concrete pile foundations and abutments with a fabricated steel frame superstructure topped by a hardwood timber deck. The suspended slab is a reinforced concrete slab on piled foundations.
Value: $1 000 000
2009 WINNER - Category 1, NSW CCF Hitachi Earth Awards
|
|
|
|
|
Mihi Creek Bridge
|
Jun 08 - Nov 08
IPSWICH CITY COUNCIL
Construction of a 4 span bridge over the Mihi Creek 80m long including substructure and superstructure works. Construction of abutment rock protection.
Value: $ 1 300 000
|
|
|
|
|
City Road Foot Bridge
|
Jul 07 - Feb 08
ABIGROUP
Construction of a pedestrian footbridge over City Road at Sydney University. Works includes demolition of the existing bridge, piling, in-situ concrete pilecaps, piers, headstocks, ramp and stairs, erection of precast girders and deck units, installation of balustrades and handrails.
Value: $2 000 000
Featured in Trends Magazine: http://trendsideas.com/go/21969
Youtube: http://www.youtube.com/watch?v=nF-k-P1rozw
|
|
|
|
|
Ropes Creek Bridge
|
Jul 07 - Feb 08
DELFIN LEND LEASE
Construction of a three span bridge at St Marys including piling, piers, headstocks and abutments, installation of precast concrete planks, construction of deck, steel walkway and barriers, and installation of rock scour protection beneath the bridge.
Value: $2 000 000
|
|
|
|
|
Construction of Pedestrian Bridge over Princess Highway at Blakehurst
|
Oct 06 - Jun 07
ROADS AND TRAFFIC AUTHORITY
Construction of a pedestrian bridge over the Princes Highway at Blakehurst including piling, concrete piers, ramps, stairs and lift shaft, precast girder, metalwork, lift installation and maintenance, roadworks and landscaping.
Value: $1 500 000
http://www.youtube.com/watch?v=juAp5RD0fOM
|
|
|
|
|
Construction of Pedestrian Bridge Over Hume Highway at Yagoona
|
Feb 06 - Oct 06
ROAD AND TRAFFIC AUTHORITY
Construction of a pedestrian bridge over the Hume Highway at Yagoona Primary School. Works include piling, reinforced concrete access stairs and columns, reinforced concrete lift shafts, design and installation of lift cars and mechanical and electrical services. Supply and installation of prestressed concrete super-T girder, safety screens, handrailing and fencing.
Value: $1 750 000
|
|
|
|
|
Towradgi Creek Bridge
|
Dec 05 - Aug 06
SYDNEY WATER CORPORATION
Construction of a pedestrian/cyclist bridge over Towradgi Creek and the demolition of the existing bridge. Works include the adjustment of existing creek alignment, bored piers, headstocks, and installation of six super-Ts, concrete works to the deck and approach slabs.
Value: $2 000 000
|
|
|
|
|
Lowes Creek Bridge Widening
|
Mar 05 - Jun 05
ROADS AND TRAFFIC AUTHORITY
Widen Lowes Creek Bridge by approximately 1.5m in each direction on The Northern Road. Works include extending the existing box culvert and construction of piles, wingwalls and the parapet.
Value: $300 000
|
|
|
|
|
Ferny Hills Pedestrian and Cycle Bridge
|
May 04 - Aug 04
PINE RIVERS SHIRE COUNCIL
Construction of a pedestrian and cyclist bridge including associated pathways, lighting and fencing.
Value: $300 000
|
|
|
|
|
Arncliffe Pedestrian Bridge
|
Jan 03 - Jul 03
ROAD AND TRAFFIC AUTHORITY
Replacement of pedestrian bridge over Princes Highway Arncliffe and associated works.
Value: $600 000
|
|
|
|
|
Sandon Point Bridge
|
Jan 03 - Mar 03
J K WILLIAMS CONTRACTING
Construction of abutments and wingwalls for bridge over railway line.
Value: $200 000
|
|
|
|
|
Sextons Hill Pedestrian Overbridge
|
Jun 02 - Nov 02
ROAD AND TRAFFIC AUTHORITY
Construction of steel truss bridge over Pacific Highway at Tweed Heads.
Value: $500 000
|
|
|
|
|
Access Bridges
|
Sep 01 - Nov 01
SYDNEY CATCHMENT AUTHORITY
Refurbishment of 4 access bridges in the Warragamba Catchment.
Value: $200 000
|
|
|
|
|
Bikeway Bridge Over Cabbage Tree Creek
|
Mar 01 - Aug 01
BRISBANE CITY COUNCIL
Construct bikeway bridge 50m long across Cabbage Tree Creek, 200m of boardwalk, stonepitching and paths.
Value: $750 000
|
|
|
|
|
Stimson's Creek Crossing
|
Jun 00 - Jul 00
AUSTIN ARENCO PTY LTD
Construction of footbridge over Stimson's Creek on the Liverpool to Parramatta cycleway.
Value: $50 000
|
|
|
|
|
Woronora Bridge Piers
|
May 99 - Apr 00
BARCLAY MOWLEM
Formwork and concrete placement at Woronora Bridge Piers. Construction in 5m jump forms with Peri system. Piers up to 35m high.
Value: $500 000
|
|
|
|