|
|
Bribie Island Emergency Storage Tanks
|
Construction of 3 emergency storage tanks for untreated sewerage....
|
|
read more
|
|
|
|
Morayfield SPS
|
Construction of a SPS well, pump chamber and emergency storage tanks......
|
|
read more
|
|
|
|
Albany Creek SPS
|
Construction of a replacement SPS including electrical and mechanical installations....
|
|
read more
|
|
|
|
Gungahlin Drive Extension Stage 2 Duplication - Barton Highway Bridge
|
Construction of a 62m twin span voided slab bridge.....
|
|
read more
|
|
|
|
Bus Wash Upgrades
|
Design and installation of water recycling plants.....
|
|
read more
|
|
|
Hunter River Remediation
|
Construction of 2 stabilisation buildings......
|
|
read more
|
|
|
Thornton Pedestrian Bridge
|
Design and construction of a steel framed pedestrian bridge....
|
|
read more
|
|
|
Wollongong STP Biosolids Handling & Odour Control Facility
|
|
|
read more
|
|
|
Potts Hill Zone Substation
|
Construction of a new electrical substation with basement cable jointing room.....
|
|
read more
|
|
|
Austar Stage 3 Ventilation Shaft
|
Construction of a fully hydrostatic blind bored ventilation shaft 460m deep to a finished diameter of 4.5m....
|
|
read more
|
|
|
Winmalee STP Modifications
|
Inlet Work modifications....
|
|
read more
|
|
|
Dora Creek WWTP Stage 2 Upgrade
|
Upgrade of the Dora Creek Waste Water Treatment Plant......
|
|
read more
|
|
|
Castle Hill Sewerage Treatment Plant
|
Civil and mechanical upgrade to the existing plant....
|
|
read more
|
|
|
Oldfield Road Pump Station
|
Civil works and mechanical fitout for the upgrade of Oldfield Rd Sewerage Pump Station .....
|
|
read more
|
|
|
Edgeworth WWTW
|
Aeration system upgrade for Edgeworth WWTW...
|
|
read more
|
|
|
Kurri Kurri WWTW
|
Design, manufacture and delivery of a Gravity Drainage Deck and Polymer Dosing Equipment...
|
|
read more
|
|
|
Gordon St Pump Station
|
Construction of a sewerage pump station.....
|
|
read more
|
|
|
Coles Rd and Beaconsfield Rd Pump Stations
|
Remediation of existing sewerage pump station ...
|
|
read more
|
|
|
Lower Molonglo Water Quality Control Centre Secondary Treatment Facility Augmentation Project
|
Upgrade of the secondary treatment facilities including the construction of three secondary clarifiers, RAS pumping stations, anoxic tanks, level control structure, MCC building, pipelines, methanol dosing facility, MLR pumping stations, Bioreactor modifications, access roads and associated works.
|
|
read more
|
|
|
Lennox Heads WWTP Optimisation Upgrade
|
|
|
read more
|
|
|
Kincumber STP Biosolids Dewatering Facility
|
Supply and installation of a dewatering facility at Kincumber Sewerage Treatment Plant...
|
|
read more
|
|
|
V8 Supercar Track Construction
|
Construction of the V8 Supercar street racing circuit at Sydney's Olympic Park...
|
|
read more
|
|
|
Landfill Tar Seep Drain 2
|
Design and construction of a subsurface tar collection drain. Maintenance of the collection system, removal and disposal of tar.
|
|
read more
|
|