Austar Stage 3 Ventilation Shaft
|
info_current1
|
Title |
Austar Stage 3 Ventilation Shaft |
|
Division |
Mining |
|
Client |
Austar Coal Mine Pty Ltd |
|
Client Contact |
Adrian Moodie Ph: 02 4993 7238 |
|
|
|
|
Current Status |
0% |
|
Project Start Date |
November 2009 |
|
Construction Period |
December 2010 |
|
Project Description |
Abergeldie Mining has recently been awarded the contract to design and construct a 465m deep ventilation and people riding shaft for Austar Coal Mine. The shaft will be used to provide ventilation and access to Austar's Stage 3 underground workings.
A composite steel and concrete lining will have a finished internal diameter of 4.5m. The liner will be fully water tight and maintenance free. |
|
Complex Challenges |
Construction requires a high level of accuracy as the challenge will be to maintain true verticality throughout the entire depth. The shaft will be constructed to within 250mm of it's centreline to eliminate complications when transporting workers and materials through the shaft.
This represents an allowable tolerance of 0.05% for the entire shaft length.
A directional pilot hole will be drilled for the drill head to follow. |
|
Contract Type |
Lump sum / Fixed |
|
Value |
$18 000 000 |
|
Consultants / Designers |
Abergeldie Mining Pty Ltd |
|
|
|
|
 |
 |
|
 |
 |
|
| Subscribe to Abergeldie’s Newsletter Service |
|
|
 |
Contact Abergeldie |
| Sydney |
PO Box 10, Regents Park
NSW 2143
p: 02 8717 7777
e: mail@abergeldie.com |
| Brisbane |
PO Box 135, Banyo
QLD 4014
p: 07 3621 0000
e: qld@abergeldie.com |
| Newcastle |
PO BOX 326, Thornton NSW 2322 p: 02 4966 3899 e: mail@abergeldie.com |
| Canberra |
PO BOX 56 Mitchell
BC 2911
p: 02 6241 1755
e: mail@abergeldie.com |
| Contact ASM Fabrications |
5/5 George Young St
Regents Park NSW 2143
p: 02 9644 7300
e: mhanda@asmfabrications.com.au |
|
 |
|